- Brand: Halstead Heating Boiler Parts
- Name: HALSTEAD 500565 IGNITION ELECTRODE LONG LEAD
- MPN: 500565
- Our Part No: 1292310
- Categories:
Why Choose DHS?
Browse more products in the
Gas Boiler Spares categoryBrowse more products from
Halstead Heating Boiler PartsSecure Express Checkout
with a selection of payment options12 Month Warranty
On all parts

This part fits the following 3 appliances (sorted alphabetically):
- Halstead Heating Boiler Parts QUATTRO CVI COMBI NG
- Halstead Heating Boiler Parts QUATTRO GOLD COMBI NG
- Halstead Heating Boiler Parts WICKES 2000 CVI COMBI NG
May fit others. If you are unsure of your product model, or would like more information, please contact us.
At DHS we offer a range of product options to suit different budgets and requirements, while maintaining quality and reliability across all categories.
Below is an explanation of each product type available on our website. Please note that not all products will have all options available.
Unbranded Part
BEST VALUE
Unbranded Component Product. Genuine manufacturer component, but no branded packaging.
- Sourced Directly from the Manufacturer
- Supplied in Unbranded Packaging
- Same Quality & Function as OEM Version
- Cost Effective Alternative
- 12 Month Warranty
Branded Part
ORIGINAL PART
Original Equipment Manufacturer Component with branded packaging.
- Genuine Original Part
- Sourced Directly from the Manufacturer
- Manufacturers Official Packaging
- Trusted Manufacturer Quality
- 12 Month Warranty
Alternative Part
Compatible replacement parts sourced from a third party Manufacturer.
- Lower Cost Replacement Option
- Fully Functional Alternative
- Appearance, design or materials may differ from the original part
- 12 Month Warranty
Refurbished Part
Original OEM components that have been professionally refurbished.
- Genuine OEM Component Professionally Refurbished and Tested
- Environmentally Conscious Choice
- Excellent Value for Money
- 12 Month Warranty
Need Help Choosing?
If you are unsure of which product category is right for your repair or installation, our team is happy to help.
Contact us for expert advice on compatibility, pricing and availability.
Recently Viewed Products...
HALSTEAD PIPE CH RETURN UPPER INTERNAL
Part No: 1297678 / MPN: 451173
Sorry, this part is now obsolete
View Part Details

