HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD

  • Our Part No: 1292314
  • MPN: 500566
HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD

We're sorry but this product has now been discontinued by Halstead Heating Boiler Parts and can no longer be purchased.

No known replacement is available.

Why Choose DHS?

HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD.

Product Information: The wiring inside a heating appliance connects the electronic control to the numerous thermostats, sensors and switches. These groups of wires allow the pcb to enact safety protocols and control the appliance.

This part is present in 3 different boilers in the Halstead range including the Halstead QUATTRO , QUATTRO GOLD , WICKES 2000 . In the next tab there is an appliance grid with links to all boilers that contain this part, Please use this if you would like to view all other spares that fit that model and download the user manual for that appliance. If none of these models match the appliance you have, please contact us before ordering so we can confirm this part is compatible.

We recommend that all parts are fitted by a fully qualified gas safe certified engineer. If you require any assistance finding a part, please feel free to contact us. Collectively we have over 200 years of boiler spares knowledge and distribution experience and our friendly call centre staff will be happy to help you with any query you may have


The HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD is a genuine, brand new Halstead Heating Boiler Parts product, covered by a Halstead Heating Boiler Parts manufacturer's guarantee.

Not what you're looking for? Try our unique Spares Finder tool or you can view all Halstead Heating Boiler Parts products.

For advice on this or any product, please call us on 0330 123 3707, email us at web@dhsspares.co.uk, or see additional ways to contact us here.

This part fits the following 3 appliances (sorted alphabetically):

May fit others. If you are unsure of your product model, or would like more information, please contact us.

At DHS we offer a range of product options to suit different budgets and requirements, while maintaining quality and reliability across all categories.

Below is an explanation of each product type available on our website. Please note that not all products will have all options available.

Unbranded Part

BEST VALUE

Unbranded Component Product. Genuine manufacturer component, but no branded packaging.

  • Sourced Directly from the Manufacturer
  • Supplied in Unbranded Packaging
  • Same Quality & Function as OEM Version
  • Cost Effective Alternative
  • 12 Month Warranty

Branded Part

ORIGINAL PART

Original Equipment Manufacturer Component with branded packaging.

  • Genuine Original Part
  • Sourced Directly from the Manufacturer
  • Manufacturers Official Packaging
  • Trusted Manufacturer Quality
  • 12 Month Warranty

Alternative Part

Compatible replacement parts sourced from a third party Manufacturer.

  • Lower Cost Replacement Option
  • Fully Functional Alternative
  • Appearance, design or materials may differ from the original part
  • 12 Month Warranty

Refurbished Part

Original OEM components that have been professionally refurbished.

  • Genuine OEM Component Professionally Refurbished and Tested
  • Environmentally Conscious Choice
  • Excellent Value for Money
  • 12 Month Warranty

Need Help Choosing?

If you are unsure of which product category is right for your repair or installation, our team is happy to help.

Contact us for expert advice on compatibility, pricing and availability.

Recently Viewed Products...

ALPHA 3.020402 HYDROBLOCK ASSEMBLY

Part No: 1258335 / MPN: 3.020402

Sorry, this part is now obsolete

View Part Details
IDEAL 175703 PIPE - PRV ASSEMBLY

IDEAL 175703 PIPE - PRV ASSEMBLY

Part No: 1781404 / MPN: 175703

£56.40 inc VAT

In stock - Next day delivery available

GLOWWORM 801229 E.V.PIPE WASHER

Part No: 1332935 / MPN: 801229

Sorry, this part is now obsolete

View Part Details
Potterton 907729 Thermostat Control Kit - K36 - Netaheat/Profile

Potterton 907729 Thermostat Control Kit - K36 - Netaheat/Profile

Part No: 1124711 / MPN: 907729

£37.00 inc VAT

In stock - Next day delivery available