SBNW 82547100 ELECTRODE WOK 900MM LONG LEAD

  • Our Part No: 4450834
  • MPN: 82547100

We're sorry but this product has now been discontinued by Stoves, Belling, New World and can no longer be purchased.

No known replacement is available.

Why Choose DHS?

  • Browse more products from
    Stoves, Belling, New World

  • Secure Express Checkout
    with a selection of payment options

  • 12 Month Warranty
    On all parts

  • The UK's #1 Heating Spares Supplier
    94% Rated Excellent/Good

SBNW 82547100 ELECTRODE WOK 900MM LONG LEAD.


The SBNW 82547100 ELECTRODE WOK 900MM LONG LEAD is a genuine, brand new Stoves, Belling, New World product, covered by a Stoves, Belling, New World manufacturer's guarantee.

Not what you're looking for? Try our unique Spares Finder tool or you can view all Stoves, Belling, New World products.

For advice on this or any product, please call us on 0330 123 3707, email us at web@dhsspares.co.uk, or see additional ways to contact us here.

At DHS we offer a range of product options to suit different budgets and requirements, while maintaining quality and reliability across all categories.

Below is an explanation of each product type available on our website. Please note that not all products will have all options available.

Unbranded Part

BEST VALUE

Unbranded Component Product. Genuine manufacturer component, but no branded packaging.

  • Sourced Directly from the Manufacturer
  • Supplied in Unbranded Packaging
  • Same Quality & Function as OEM Version
  • Cost Effective Alternative
  • 12 Month Warranty

Branded Part

ORIGINAL PART

Original Equipment Manufacturer Component with branded packaging.

  • Genuine Original Part
  • Sourced Directly from the Manufacturer
  • Manufacturers Official Packaging
  • Trusted Manufacturer Quality
  • 12 Month Warranty

Alternative Part

Compatible replacement parts sourced from a third party Manufacturer.

  • Lower Cost Replacement Option
  • Fully Functional Alternative
  • Appearance, design or materials may differ from the original part
  • 12 Month Warranty

Refurbished Part

Original OEM components that have been professionally refurbished.

  • Genuine OEM Component Professionally Refurbished and Tested
  • Environmentally Conscious Choice
  • Excellent Value for Money
  • 12 Month Warranty

Need Help Choosing?

If you are unsure of which product category is right for your repair or installation, our team is happy to help.

Contact us for expert advice on compatibility, pricing and availability.

Recently Viewed Products...

GLOWWORM S212132 GASKET 3MM THERMOTEX/ALTEC

Part No: 1334626 / MPN: S212132

Sorry, this part is now obsolete

View Part Details
Ravenheat 5012051 3 Way Valve Diaphragm - RSF/CSI

Ravenheat 5012051 3 Way Valve Diaphragm - RSF/CSI

Part No: 1840101 / MPN: 5012051

£45.60 inc VAT

In stock - Next day delivery available

LINIAN SUPERCLIP ORANGE 15-18MM (1LSO1518)(CC7)

LINIAN SUPERCLIP ORANGE 15-18MM (1LSO1518)(CC7)

Part No: 8012325 / MPN: 1LSO1518

Sorry, this part is now obsolete

View Part Details

GLOWWORM S230287 INJECTOR BURNER FKFB50/ERF50

Part No: 1335122 / MPN: S230287

Sorry, this part is now obsolete

View Part Details